Project Description
Challenge
A lift was required for the new home for the Life Church at Sheringham. This was part of a long term project to refurbish the old cinema in Sheringham to create a beautiful facility to serve the needs of the church and the people of the area. The church offers a fantastic cafe at the front which follows through to a 200 seater auditorium. There are also plenty of rooms on both floors for smaller gatherings and for our work with children and youth.
Solution
A 2 stop, platform lift.
Results
The installation of the lift ensures that their fantastic new facilities are accessible to all.